An advanced contract award notice (ACAN) is a public notice indicating to the supplier community that a department or agency intends to award a contract for goods, services or construction to a pre-identified supplier, thereby allowing other suppliers to signal their interest in bidding, by submitting a statement of capabilities. If no supplier submits a statement of capabilities that meet the requirements set out in the ACAN, on or before the closing date and time stated in the ACAN, the contracting officer may then proceed with the award to the pre-identified supplier.
1. Definition of requirement:
The Correctional Service Canada has a requirement to assist offenders to reintegrate into the community as law-abiding citizens.
The CCRA requires that the Correctional Service Canada (CSC) ensure that programs, plans, and supervision are in place in institutions and the community to assist in an offender’s reintegration. The work will involve the following:
1.1 Objectives: To assist CSC in meeting its mandate to provide case management services for offenders on conditional release in the area of Cape Breton, NS.
1.2 Tasks:
The contractor must provide Case Management Services for offenders on Conditional Release, such as Community Assessments, Conditional Release Supervision, Preliminary Assessments, Post-Sentence Community Assessments, Community Strategies and Assessments and Tandem Accompaniment.
1.3 Expected results:
The contractor will maintain the supervision standards and content guidelines established for reports established by the CSC.
Offenders will be supervised at the frequency of contact established by the CSC and assist in the reintegration of offenders as per the supervision standards.
The contractor will assess risk on an ongoing basis and in consultation with CSC and report immediately if the activities of the offender indicate a breach of the conditions of the release, the potential for a breach or if public safety is at risk.
1.4 Performance standards:
The contractor will maintain the standards for completion of work as laid out in the supervision standards such as frequency of contact, timeframes for the completion of casework records and BFs for the completion of reports as assigned by the CSC office.
The information will be entered into the Offender Management System (OMS) by the contractor.
The contractor must have CISD clearance.
1.5 Deliverables:
1.5.1 Case Management reports must be submitted to the Technical Authority according to the format and frequency determined in consultation with the Project Authority and according to CSC policies.
The Contractor must maintain clear, legible and detailed Casework Records which shall include reference to all contacts made with the offender, location of contact (e.g. home, work); time and date of contact; type of contact (e.g. face to face, phone). The Contractor must clearly indicate in Casework Records if the contact is collateral and the name(s) of the collateral contact(s) and their relationship to the offender.
All Casework Records prepared by the Contractor must be delivered to CSC within a maximum of seven (7) days following the contact or activity in accordance with policy requirements. If the Contractor has access to OMS, the Contractor must enter Casework Records in OMS in accordance with policy as soon as possible, but no later than seven (7) calendar days.
At the request of the Technical Authority , the Contractor must
prepare and submit a formal written report (which may include the Correctional Plan [CP] - Updated, Assessment for Decision, etc.) to the Technical Authority in the following circumstances: a. an increase in the offender’s risk; b. a breach of a special condition; c. suspension; d. transfer of the case; e. proposal for change to the conditions of release; f. any situation requiring notification to the Parole Board of Canada;
g. exceptional incidents; and, h. termination of supervision (including suspension and warrant expiry).
The Contractor must complete and forward an evaluation, using a Community Assessment, to the Technical Authority following the completion of an Unescorted Temporary Absence (UTA).
The Contractor must complete the following reports at the request of the Project Authority in accordance with applicable legislation and policy:
a. Preliminary Assessment report;
b. Community Assessment report;
c. Post-Sentence Community Assessment report; and
d. Community Strategy report.
1.5.2 Paper consumption:
a. Should printed material be required, double sided printing in black and white format is the default unless otherwise specified by the Project Authority.
b. The Contractor must ensure printed material is on paper with a minimum recycled content of 30% and/or certified as originating from a sustainably managed forest.
c. The Contractor must recycle unneeded printed documents (in accordance with Security Requirements).
1.6 Constraints:
1.6.1 Location of work:
a. The Contractor must perform the work at 262 Bentinck Street, Sydney, NS B1P 1G9
b. Travel to the following locations will be required for performance of the work under this contract: Cape Breton, NS
1.6.2 Language of Work:
The contractor must perform all work in English
1.6.3 Security Requirements:
This contract includes the following security requirements: a. The Contractor must, at all times during the performance of the Contract, hold a valid Designated Organization Screening (DOS), issued by the Canadian Industrial Security Directorate (CISD), Public Works and Government Services Canada (PWGSC).
b. The Contractor personnel requiring access to sensitive work site(s) must EACH hold a valid reliability status granted or approved by CISD/PWGSC.
c. Subcontracts which contain security requirements are NOT to be awarded without the prior written permission of CISD/PWGSC.
d. The Contractor must comply with the provisions of the:
Security Requirements Check List; Industrial Security Manual (Latest Edition)
2. Minimum essential requirements:
Any interested supplier must demonstrate by way of a statement of capabilities that it meets the following requirements:
Experience:
- Must have at least 5 years obtained within the last 10 years, working in the field of corrections. - Must have at least 5 years obtained within the last 10 years, working with offenders on conditional release. - Must have working knowledge of the Corrections and Conditional Release Act (CCRA) - Must have a working knowledge of the Corrections and Conditional Release Regulations (CCRR)
3. Applicability of the trade agreement (s) to the procurement
This procurement is not subject to any trade agreement.
4. Set-aside under the Procurement Strategy for Aboriginal Business
This procurement is not subject to any set-asides for Aboriginal Suppliers.
5. Comprehensive Land Claims Agreement (s)
This procurement is not subject to a Comprehensive Land Claims Agreement.
6. Justification for the Pre-Identified Supplier
The contractor has the ability and sufficient resources (Staff) to help CSC with the Case Management and Supervision required of the Parole Office that is currently under staffed.
This is a necessary requirement for CSC to meet its Mandate.
7. Government Contracts Regulations Exception(s)
The following exception to the Government Contracts Regulations is invoked for this procurement under subsection: only one person is capable of performing the contract.
8. Exclusions and/or Limited Tendering Reasons
The following exclusion (s) and/or limited tendering reasons are invoked under the section of the trade agreement (s) specified: This procurement is not subject to any trade agreement.
9. Ownership of Intellectual Property
Ownership of any foreground intellectual property arising out of the proposed contract will vest with the Contractor.
10. The period of the proposed contract or the delivery date(s)
The proposed contract is for a period of 1 year, from May 1st, 2014 to April 30th, 2015 with an option to extend the contract for 2 additional one-year periods.
11. A cost estimate of the proposed contract
The estimated value of the contract, including option (s), is $185,733.60 (GST/HST extra).
12. Name and address of the pre-identified supplier
Howard House Association of Cape Breton 262 Bentinck Street, Sydney, NS B1P 1G9
13. Suppliers' right to submit a statement of capabilities
Suppliers who consider themselves fully qualified and available to provide the goods, services or construction services described in the ACAN, may submit a statement of capabilities in writing to the contact person identified in this notice on or before the closing date and time of this notice. This statement of capabilities must clearly demonstrate how the supplier meets the advertised requirements.
14. The closing date and time for a submission of a statement of capabilities
The closing date and time for accepting statements of capabilities is April 22, 2014 at 2:00 p.m. ADT.
15. Enquiries and submission of statement of capae Secrétariat du Conseil du Trésor (SCT), de concert avec Services partagés Canada (SPC), dirige un processus pangouvernemental de modernisation des TI, dont un des piliers est l’initiative de RCD, prévoyant notamment à compter de 2015 une migration des applications ministérielles vers des centres de données regroupés, avec une échéance fixée en 2017. En vue de cette migration, les ministères sont priés d’aligner leurs applications avec une série de normes de plateforme et d’application pour le RCD. Les applications non conformes aux normes de RCD ne seront pas supportées par l’infrastructure de SPC. Comme PCH ne possède plus l’infrastructure nécessaire pour supporter ces applications, il y a un risque important qu’elles deviennent inopérantes, ce qui empêcherait le Ministère d’offrir adéquatement ses programmes et ses services.
Initiative de transformation des services de courriel (ITSC) :
À la demande du SCT, les ministères fédéraux opéreront une migration vers le service pangouvernemental commun de courriel basé sur la plateforme Microsoft Outlook/Exchange. SPC a planifié l’ITSC en trois vagues, tous les ministères devant dès maintenant être en mode préparation. La première vague doit se terminer en juin 2014, la deuxième en octobre 2014 et la troisième en mars 2015. Considérant la complexité du projet, PCH fait partie de la deuxième vague et doit donc migrer pour octobre 2014 vers la plateforme de courriel commune.
Le changement de plateforme des actuelles applications Lotus Notes s’étalera sur trois ans, pour prendre fin dans l’exercice 2016-2017. Le gouvernement du Canada ne supportera que pendant un certain temps l’environnement de développement Lotus Notes, et c’est pourquoi PCH doit complètement délaisser Lotus Notes.