328 Oak St
Foundation Scope of Work – Jan 30, 2025
Planned time of work: April 2025
Follow details on design plans.
Approximate 178 linear feet of 9 foot tall 8" cast inplace and 67 linear feet of 24" tall x 8" grade beam.
Supply and install the following:
All piles, foundation walls, garage grade beam and weeping drainage system.
Pile placement, marking, manage drilling, concrete placement.
Include concrete sonotube for piling as required.
Void form as required.
Weeping tile, sump pit and drainage gravel (around perimeter).
Ensure all weeping tile is sloped correctly and is ready for municipal inspection
All material required for forming walls with piles.
Ensure lateral support to prevent all movement during pouring.
Fill all form tie holes with hydraulic cement.
Damp proofing to consist of Blueskin membrane and proper primer.
Exclusions:
Pile drilling and tailings hauling costs.
No wood detail at top of foundation.
No wall anchors to be installed into wet concrete.
Sump pump
Provide optional pricing for:
1. Concrete supply
2. Concrete pump
3. Blueskin damp proofing
4. Concrete flatwork (basement, garage and driveway)