D3.
SCOPE OF WORK
D3.1 The Work to be done under the Contract shall consist of two parts:
(a) Part 1 – City Funded Work
(b) Part 2 – Manitoba Hydro Funded Work.
Part 1 – City Funded Work
D3.2 Part 1 – City Funded Work shall consist of:
(a) Pavement Rehabilitation
(i) Bayview Pl – Paulley Dr to McMeans Av E
(ii) Dzyndra Cr – Bournais Dr to Hatcher Rd
(iii) Marcus Pl – Whiteway Rd to End
(iv) McMullen Cr – Hatcher Rd to Hatcher Rd
(v) Paulley Dr – Dowling Av E to Redonda St
(vi) Sims Cr – Hatcher Rd to Hatcher Rd
(vii) Whiteway Rd – Sanford Fleming Rd to Clouston Dr
(b) Asphalt Reconstruction
(i) Gillies Cr – Hatcher Rd to Hatcher Rd
(c) Pedestrian Crossing Improvement
(i) Devonshire Dr W at Dawnville Dr
Part 2 – Provincially Funded Work
D3.3
Part 2 – Provincially Funded Work shall consist of:
(a) Streetlighting Renewal
(i) Gillies Cr – Hatcher Rd to Hatcher Rd
D3.4 The City currently has no approved funding in the Capital Budget for Part 2 of the Work, but is anticipating receiving notification about funding from the Manitoba Hydro by late May. Part 2 of the Work is contingent upon the Province approving sufficient funding.
D3.4.1 Further to C7.1, if notice of sufficient funding is not received, the City shall have the right to eliminate all or any portion of Part 2, and the Contract Price will be reduced accordingly.
D3.4.2 Further to C7.5, C7.5.1, and C7.6, a reduction in the Contract Price pursuant to D3.4.1 shall not be considered in calculating the aggregate reduction in the Contract Price for purposes of C7.5.
D3.4.3 If all or any portion of Part 2 is eliminated pursuant to D3.4.1, the time periods stipulated in D23 for Substantial Performance of the Work and in D24 for Total Performance of the Work will be reduced proportionally by the Contract Administrator acting reasonably.
D3.5 The major components of the Work are as follows:
(a) Pavement Rehabilitation
(i) Planing of existing asphalt, as required;
(ii) Renewal of existing sidewalk, as required;
(iii) Construction of concrete sidewalk;
(iv) Installation of detectable warning tiles;
(v) Installation of catch basins / catch pits and connection pipes;
(vi) Abandon existing drainage inlets;
(vii) Full depth concrete joint and slab repairs;
(viii) Removal / renewal of existing curb;
(ix) Construction of modified lip curb;
(x) Installation / renewal of modified barrier curb and curb ramp;
(xi) Adjustment of precast sidewalk blocks;
(xii) Adjustment of existing catch basin, catch pit, and manhole frames and covers;
(xiii) Adjustment of water main valves, curb stops and other appurtenances;
(xiv) Placement of pavement repair fabric, as required;
(xv) Placement of asphalt overlay;
(i) Thickness 80mm (average)
(xvi) Boulevard restoration and sod.
(b) Asphalt Reconstruction
(i) Pavement Removal;
(ii) Excavation;
(iii) Placement of suitable site sub base material as required;
(iv) Placement of geotextile fabric;
(v) Placement of geogrid;
(vi) Insulation of water services;
(vii) Subgrade compaction;
(viii) Placement of sub-base and base course material;
(ix) Installation of Catch Basin and connecting pipes;
(x) Installation of subdrains;
(xi) Construction of 150mm barrier curb for asphalt pavements – utilizing slip form paving equipment (SD-200A);
(xii) Construction of modified barrier for asphalt pavements;
(xiii) Construction of 40mm lip curb for asphalt pavements (SD-202B);
(xiv) Construction of ramp curb for asphalt pavements;
(xv) Placement and compaction of 50mm sub-base material as backfill behind barrier curb for asphalt pavement within excavated area;
(xvi) Placement and compaction of suitable site material as backfill behind barrier curb for asphalt pavement within excavated area;
(xvii) Installation of 150mm reinforced approach;
(xviii) Adjustment of precast sidewalk blocks;
(xix) Placement of asphalt pavement (Type MS2, 60mm thickness);
(xx) Placement of asphalt pavement (Type MS1, 50mm thickness);
(xxi) Adjustment of existing catch basins, manholes and appurtenances; and
(xxii)Boulevard restoration and sod.
(c) Pedestrian Crossing Improvement
(i) Boulevard excavation;
(ii) Removal/renewal of existing curb;
(iii) Construction of concrete sidewalk;
(iv) Installation of detectable warning tiles;
(v) Boulevard restoration and sod; and
(vi)Installation of conduit, concrete bases, service boxes and ground rods for Traffic Signals.