D3. SCOPE OF WORK
D3.1 The Work to be done under the Contract shall consist of:
(a) Construction of Protected Bike Path - Westminster Ave. / Young St. / Balmoral St. / Granite
Way – from Walnut Street to Osborne Street North
(i) Pavement Rehabilitations
(ii) Asphalt Bike Path Construction
(iii) Adjustable Pre-Cast Bike Lane Curb Installation
D3.2 The major components of the Work are as follows:
(a) Construction of Protected Bike Path (including pavement rehabilitation, asphalt bike path,
construction and adjustable pre-cast bike lane curb installation)
(i) Removal of existing trees
(ii) Removal and Installation of curb and gutter inlets, catch basins, catch pits and
connection pipe
(iii) Insulation of catch basins and catch pits as required
(iv) Connections to existing sewers
(v) Connections to existing catch basins and existing services
(vi) Adjustment of existing manholes
(vii) Adjustment of valves and curb stop boxes
(viii) Removal of existing pavement
(ix) Excavation
(x) Compaction of existing sub-grade
(xi) Placement of base course or levelling course materials
(xii) Placement of non-woven geotextile fabric and geogrid
(xiii) Full depth concrete repairs of joints and slabs
(xiv) Construction of monolithic concrete median slabs
(xv) Planing existing asphalt pavement
(xvi) Removal of existing concrete curb and concrete sidewalk (where applicable)
(xvii) Renewal of existing concrete barrier, modified barrier and ramp curbs
(xviii) Removal and construction of new concrete barrier, modified barrier and ramp curbs
for geometry changes
(xix) Construction of new 150mm reinforced concrete pavement (parking zones, loading
zones, back lanes, approaches, geometric improvements)
(xx) Renewal of existing 100mm concrete sidewalk