SCOPE OF WORK
The Work to be done under the Contract shall consist of supply and delivery of concrete for the period from May 1, 2023, until April 30, 2024, with the option of two(2) mutually agreed upon one(1) year extensions.
D2.1.1 The City may negotiate the extension option with the Contractor within ninety (90) Calendar Days prior to the expiry date of the Contract. The City shall incur no liability to the Contractor as a result of such negotiations.
D2.1.2 Changes resulting from such negotiations shall become effective on May 1stof the respective year. Changes to the Contract shall not be implemented by the Contractor without written approval by the Contract Administrator.
D2.1.3 Bidders are advised that, in future, the City may be participating in collaborative procurement initiatives with other levels of government. Accordingly, extensions to this Contract may not be exercised.
The major components of the Work are as follows:
(a) Supply of approximately nine thousand seven hundred eighty (5300 m³) cubic metres of Concrete of various types of specified mix designs:
(i) Approximate total weekday volume; nine thousand two hundred eighty (5100 m³) cubic metres;
(ii) Approximate total weekend volume; five hundred (200 m³) cubic metres.
(b) Total delivery of approximately three thousand eight hundred (1000 m³) cubic metres of Concrete.
The Work shall be done on an "as required" basis during the term of the Contract.
D2.3.1 The type and quantity of Work to be performed under this Contract shall be as authorized from time to time by the Contract Administrator and/or Users.
D2.3.2 Subject to C7, the City shall have no obligation under the Contract to purchase any quantity of any item in excess of their actual operational requirements.
Notwithstanding D2.1, in the event that operational changes result in substantial changes to the requirements for Work, the City reserves the right to alter the type or quantity of work performed under this Contract, or to terminate the Contract, upon thirty (30) Calendar Days written notice by the Contract Administrator. In such an event, no claim may be made for damages on the ground of loss of anticipated profit on Work.