D3. SCOPE OF WORK
D3.1 The Work to be done under the Contract shall consist of three parts:
(a) Part 1 – City Funded Work
(b) Part 2 – Manitoba Hydro Funded Work
(c) Part 3 – City Funded Work.
Part 1 – City Funded Work
D3.2 Part 1 – City Funded Work shall consist of:
(a) Pavement Rehabilitation
(i) Smith Street – Midtown Bridge to Graham Avenue
(b) Concrete Pavement Reconstruction
(i) Smith Street – Graham Avenue to Notre Dame Avenue
(c) Manhole and Sewer Work
(i) Smith Street (MH20014368) – Remove/Replace Manhole Risers
(ii) Smith Street (MH20014296) – Remove/Replace Manhole Risers and Grout Pipe Connections
(iii) Smith Street (MH20014194) – Remove/Replace Manhole Risers
(iv) Smith Street (MH20014272) – Remove/Replace Manhole Risers and Grout Benching
(v) Smith Street (MH20012848) – Remove/Replace Manhole Risers
(vi) Smith Street (MH20012838) – Remove/Replace Manhole Risers
(vii) Smith Street (MH20012904) – Remove/Replace Manhole Risers
(viii) Smith Street (MH20014447) – Replace Benching
(ix) Smith Street (MH20014446) – Grout Benching
(x) Smith Street (MH20014448) – Replace Benching
(d) Traffic Signals Installations
(i) Traffic Signals Installation – Smith Street and Navy Way
(ii) Traffic Signals Installation – Smith Street and Broadway
(iii) Traffic Signals Installation – Smith Street and York Avenue
(iv) Traffic Signals Installation – Smith Street and St. Mary Avenue
(v) Traffic Signals Installation – Smith Street and Graham Avenue
(vi) Traffic Signals Installation – Smith Street and Portage Avenue
(vii) Traffic Signals Installation – Smith Street and Ellice Avenue
(viii) Traffic Signals Installation – King Street and Notre Dame Avenue
Part 2 – Manitoba Hydro Funded Work
D3.3 Part 2 – Manitoba Hydro Funded Work shall consist of:
(a) Street Lighting and Associated Works
(i) Smith Street – Smith Street at Navy Way
(ii) Smith Street – Graham Avenue to Notre Dame Avenue
Part 3 – Winnipeg Police Service Building Bollards
D3.4 Part 3 – Winnipeg Police Service Building Bollards Work shall consist of:
(a) Removal of Existing Traffic Barriers and Delivery to City Yard
(b) Removal of Sidewalk
(c) Supply and Installation of Bollards
(d) Sidewalk Restoration
D3.5 The City currently has no approved funding in the Capital Budget for Part 2 of the
Work, but is anticipating receiving notification about funding from Manitoba Hydro during the Award
Period. Part 2 of the Work is contingent upon Manitoba Hydro approving sufficient funding.
D3.5.1 Further to C7.1, if notice of sufficient funding is not received, the City shall
have the right to eliminate all or any portion of Part 2, and the Contract Price will be reduced
accordingly.
D3.5.2 Further to C7.5, C7.5.1, and C7.6, a reduction in the Contract Price pursuant to
D3.5.1 shall not be considered in calculating the aggregate reduction in the Contract Price for
purposes of C7.5.
D3.5.3 If all or any portion of Part 2 is eliminated pursuant to D3.5.1, the time
periods stipulated in D22 for Substantial Performance of the Work and in D23 for Total Performance of the Work will be reduced proportionally by the Contract Administrator acting reasonably.
D3.6 The major components of the Work are as follows:
(a) Pavement Rehabilitation
(i) Installation of Traffic Signals Infrastructure
(ii) Complete Manhole and Sewer Work (Sewer Inspections as required)
(iii) Planing existing asphalt pavement
(iv) Installation of Winnipeg Police Service Building Bollards including removal of existing
traffic barriers, delivery of existing traffic barriers to City yard and the supply/installation of
the bollards
(v) Removal and salvage of Aluminum Balance Barrier Rail
(vi) Full depth concrete repairs of existing joints and slabs
(vii) Geometric Improvements at Navy Way
(viii) Renewal of existing curbs in gutter lanes
(ix) Replacement of existing catch basins and catch basin leads
(x) Adjustment of catch basins, sewer manholes, appurtenances, and utility manholes
(xi) Renewal of existing sidewalk
(xii) Placement of asphalt overlay (Type 1A, average thickness 85 mm)
(xiii) Construct new 100 mm concrete sidewalk c/w paving stone band
(xiv) Installation of plant materials
(xv) Installation of detectable warning tiles
(xvi) Supply and placement of paving stones
(xvii) Supply and installation of amenities (bike racks, tree grates, etc.)
Boulevard restoration
(b) Concrete Pavement Reconstruction
(i) Installation of Traffic Signals Infrastructure
(ii) Complete Manhole and Sewer Work (Sewer Inspections as required)
(iii) Installation of curb and gutter inlets, catch basins, catch pits, and connection pipe
(iv) Installation of catch basins and catch pits (as required)
(v) Connection to existing sewer
(vi) Connection to existing manholes and existing services
(vii) Removal and salvage of Aluminum Balance Barrier Rail
(viii) Remove existing pavement
(ix) Excavation (c/w removal of existing concrete street car bedding and wood ties)
(x) Insulation of water services (as required)
(xi) Compaction of existing sub-grade
(xii) Placement of separation/filtration fabric and geogrid
(xiii) Placement of sub-base and base course materials
(xiv) Installation of subdrains
(xv) Adjustment of existing sewer manholes and utility manholes
(xvi) Construction of 250 mm plain dowelled concrete pavement utilizing hand-placed or slip
form methods c/w 180 mm separate barrier curb (where applicable)
(xvii) Complete curb renewal at intersections beyond reconstruction limits (as required)
(xviii) Construction of 250 mm plain dowelled concrete pavement at all side street connections
(xix) Construction of 200 mm reinforced concrete pavement (back lanes/private
driveways/approaches/geometric improvements)
(xx) Remove existing concrete/paving stone sidewalk
(xxi) Installation of street light bases, conduit, new light standards and street light cable
(xxii) Construction of Silva Cell soil retention system
(xxiii) Placement of trees
(xxiv) Construction of new 100 mm concrete sidewalk c/w paving stone band and detectable
surface warning tiles
(xxv) Supply and placement of interlocking paving stones
(xxvi) Supply and installation of amenities (bike racks, tree grates, etc.)
(xxvii) Boulevard restoration