B3. SITE INVESTIGATION
B3.1 The Consulting Contract Administrator or an authorized representative will conduct site
tours of the sludge holding tanks at each plant as follows:
(a) West End Sewage Treatment Plant (WEWPCC) – 7740 Wilkes Avenue, Headingley, MB – February 15,
2024 @ 8:00 AM; and South End Sewage Treatment Plant (SEWPCC) – 100 Ed Spencer Drive, Winnipeg, MB
– February 15, 2024 @ 10:30 AM
(b) West End Sewage Treatment Plant (WEWPCC) – 7740 Wilkes Avenue, Headingley, MB – February 21,
2024 @ 8:00 AM; and South End Sewage Treatment Plant (SEWPCC) – 100 Ed Spencer Drive, Winnipeg, MB
– February 21, 2024 @ 10:30 AM
B3.1.1 Proponents are requested to register for the site tours by contacting the
Consulting Contract Administrator identified in D2.
B3.1.2 The tour will be approximately one hour in duration.
B3.2 Although attendance at the site tours is not mandatory, the City strongly suggests that
Proponents attend.
B3.3 The Proponent shall not be entitled to rely on any information or interpretation
received at the site tours unless that information or interpretation is the Proponent’s direct
observation, or is provided by the Consulting Contract Administrator in writing.
B3.4 The Proponent is responsible for inspecting the Site, the nature of the Work to be done
and all conditions that might affect their Proposal or their performance of the Work, and shall
assume all risk for conditions existing or arising in the course of the Work which have been or
could have been determined through such inspection.