D3. SCOPE OF WORK
D3.1 The Work to be done under the Contract shall consist of:
(a) Local Improvements
(i) Birchdale Avenue/Lawndale Avenue Alley– The block bounded by Birchdale Avenue, Lawndale
Avenue, Lyndale Drive and Coniston Street
(ii) Guay Avenue/Fifth Avenue Alley – The block bounded by Guay Avenue, Fifth Avenue, St.
Mary’s Road and Des Meurons Street
(iii) Giroux Street/Kavanagh Street Alley – The bock bounded by Giroux Street, Kavanagh Street,
Dufresne Avenue and existing concrete lane west limit.
(b) Thin Bituminous Overlay (TBO)
(i) Greencrest Avenue – Ulster Street to Pembina Highway
(ii) Macalester Bay – Silverstone Avenue to Silverstone Avenue
(iii) Tulane Bay – Pasadena Avenue to Pasadena Avenue
(iv) Brotman Bay – John Forsyth Road to John Forsyth Road
(v) Ravine Drive – River Point Drive to Settlers Road
(vi) Beechtree Crescent – Beliveau Road to Beliveau Road
(vii) Beliveau Road E – St. Annes Road to Marlene Street
(viii) Glenthorne Crescent – Darwin Street to Greendell Avenue
(ix) Glenthorne Crescent – Woodlawn Avenue to Greendell Avenue
(x) Bluewater Crescent – Cherwell Road (N. leg) to Cherwell Road (S. Leg)
(xi) Notre Dame Street – St Joseph Street to Langevin Street
(i) Horace Street – Enfield Crescent to Des Meurons Street
D3.2 The Work to be done under the Contract shall consist of:
(a) Local Improvements
(i) Part 1 – Residential Surface Works
(ii) Part 2 – City of Winnipeg Paid Works
(iii) Part 3 – Drainage and Underground Works
(b) Thin Bituminous Overlay
D3.3 The major components of the Local Improvement Work are as follows:
(a) Part 1 – Residential Surface Works
(i) Removal of existing approaches
(ii) Excavation
(iii) Compaction of existing sub-grade
(iv) Placement of separation/reinforcement fabric and geogrid
(v) Placement and compaction of sub-base and base course materials
(vi) Construction of new concrete catchbasin/manhole aprons and tees
(vii) Construction of 125mm asphalt pavement surface
(viii) Renewal of existing approaches
(ix) Renewal of miscellaneous concrete slabs, curbs and sidewalk
(x) Final restorations
(b) Part 2 – City of Winnipeg Paid Works
(i) Removal of existing approaches
(ii) Excavation
(iii) Compaction of existing sub-grade
(iv) Placement of separation/reinforcement fabric and geogrid
(v) Placement and compaction of sub-base and base course materials
(vi) Construction of new concrete catchbasin/manhole aprons and tees
(vii) Construction of 125mm asphalt pavement surface
(viii) Renewal of miscellaneous concrete slabs, curbs and sidewalk
(ix) Final restorations
(c) Part 3 – Drainage and Underground Works
(i) Removal of existing manholes, catchbasins and catchpits
(ii) Installation of new land drainage sewer
(iii) Installation of new manholes and/or catchbasins
(iv) Installation of subdrains
(v) Adjust existing manhole and/or catchbasin frame and covers
(vi) Land drainage sewer excavations to be jetted, flooded and tamped
(vii) Televise new land drainage sewer.
D3.4 The major components of the Thin Bituminous Overly (TBO) Work are as follows:
(i) Planing of existing asphalt overlays;
(ii) Planing of existing asphalt and/or concrete pavements and lip curbs;
(iii) Full depth concrete repairs of existing slabs and joints;
(iv) Placement of Pavement repair fabric
(v) Adjustments of drainage inlets, manholes, catch basins, and water valves;
(vi) Curb and sidewalk renewal; and
(vii) Placement of asphalt overlay (average thickness 55mm)
(viii) Restoration of boulevards