Under the Climate-Resilient Core Public Infrastructure project, the National Research Council’s Building Regulations for Market Access Program has a requirement to update their National Model Codes and referenced standards to reflect climate change adaptation and extreme weather events. A new CSA Standard will be introduced under this contract. The standard will introduce climate change adaptation for Canada’d protection, analyze threats against them, assess the current risk, and recommend safeguards to reduce the risk to an acceptable level. Federal Government Departments rely on base building SDB's to determine safeguards for facilities it administers as a custodian department.
c) Security Consulting Services (SCS) The Security Consultant is required to manage, review, monitor and coordinate the implementation of the physical security solution for a facility rehabilitation or new construction project.
While others will be responsible for the implementation and support of the Integrated Security System (ISS), the Security Consultant will provide project management services, as directed by the Technical Authority.
The goal of these services is to ensure a successful security design and implementation.
The Security Consultant will validate and verify that the security design and implementation meet the Client's needs, as set out in various functional and programmatic requirements documents.
In addition, the Security Consultant will be responsible for the detailed design requirements and validating the implementation of all architectural and personnel-related solutions and programs not provided by others to ensure that they meet the specified requirements.
Response time
The Contractor is required to respond to individual call-ups (as determined at the time of each individual call-up) according to the following:
For a normal requirement, the contractor must respond by electronic mail within 3 business days
For urgent requirements, the contractor must respond by electronic mail within 2 business days
Period of the Standing Offer
This RFSO will result in Regional Individual Standing Offer (RISO) valid for five (5) years.
Security Requirement (before award of Standing Offer)
Consult the Canadian Industrial Security Directorate (CISD)Website for more information.
The following security requirement (SRCL and related clauses) applies and form part of the Standing Offer.
1. The Contractor/Offeror must, at all times during the performance of the Contract/Standing Offer,
hold a valid Facility Security Clearance at the level of
SECRET, with approved Document
at the level of SECRET, issued by the Canadian Industrial Security Directorate (CISD),
Public
Works and Government Services Canada (PWGSC).
2.
The Contractor/Offeror personnel requiring access to CLASSIFIED information, assets or sensitive work site(s) must EACH hold a valid personnel security screening at the level of SECRET, granted or approved by the CISD, PWGSC.
3.
The Contractor MUST NOT utilize its Information Technology systems to electronically process, produce or store any sensitive CLASSIFIED information until CISD/PWGSC has issued written approval.
After approval has been granted, these tasks may be performed at the level of SECRET.
4.
Subcontracts which contain security requirements are NOT to be awarded without the prior written permission of CISD/PWGSC.
5.
The Contractor/Offeror must comply with the provisions of the:
(a)
Security Requirements Check List and security guide (if applicable), attached at Annex C;
(b)
Industrial Security Manual (Latest Edition).
Offeror's Site or Premises Requiring Safeguard Measures
The Offeror must diligently maintain up-to-date, the information related to the Offeror's site or premises, where safeguard measures are required in the performance of the Work, for the following addresses: Address: Street Number / Street Name, Unit / Suite / Apartment Number City, Province, Territory / State Postal Code / Zip Code Country
Language Capability
While the majority of the services and deliverables will be delivered in English language, there may be a requirement to provide services and deliverables in French language.
Basis of Selection
An offer must comply with the requirements of the Request for Standing Offers to be declared responsive. The responsive offer with the lowest evaluated price will be recommended for issuance of a standing offer.
Enquiries
All enquiries regarding this requirement s waste water treatment plants specifically high flow event diversion, erosion, site adaptation, backflow, and material deterioration. The standard would be published and owned by the Canadian Standards Association (CSA) - a Canadian not for profit standard development organization.
The Climate-Resilient Core Public Infrastructure project aims to integrate climate resilience into design guides, codes and related materials, which will be the basis for future infrastructure builds and rehabilitation work in Canada. The work would involve preparation of proposed changes to national model building, energy, fire, plumbing and updated related guidance documents. The proposed change modules could be adopted by provinces and territories in 2020.
This contract seeks to enter into an agreement with the CSA to develop a CSA Waste Water Treatment Plant Standard with principle objective stemming from this funding to support sections related to climate change adaptation and extreme weather events through a consensus based process established by the Standards Council of Canada. The CSA standard development will occur concurrently and in harmonization with the work currently underway at the NRC to update their National Model Codes.