SECTION I - Winnipeg Traffic Signals, intersection of Provincial Trunk Highway (PTH) 101 and Wenzel Rd.
Installing Traffic Signal Plant which includes concrete bases, underground electrical conduits, and pull pits at the Intersection.
Installation of new signals and detection Cabling, Poles, Signal Heads, Power Pedestal and Traffic Controller will be by Manitoba Infrastructure, Traffic Engineering.
SECTION II - Niverville, Pedestrian Corridor at Provincial Road (PR) 311 and 4th St.
Installing Pedestrian Corridor Plant which includes concrete bases, underground electrical conduits, pull pits and any cutover work needed at the Pedestrian Corridor.
Installation of new signals Cabling, Poles, Signal Heads, and PXO Controller will be by Manitoba Infrastructure, Traffic Engineering.
After the corridor has been transitioned to the new corridor by Manitoba Infrastructure, demolition of:
- Non-reused Pedestrian Corridor plant.
SECTION III - Oakbank, Pedestrian Corridor at Provincial Road (PR) 206 and Willow St.
Installing Pedestrian Corridor Plant which includes concrete bases, underground electrical conduits, pull pits and any cutover work needed at the Pedestrian Corridor.
Installation of new signals Cabling, Poles, Signal Heads, and PXO Controller will be by Manitoba Infrastructure, Traffic Engineering.
After the corridor has been transitioned to the new corridor by Manitoba Infrastructure, demolition of:
- Non-reused Pedestrian Corridor plant.
SECTION IV - Beausejour, Pedestrian Corridor at Provincial Road (PR) 215 and 2nd St.
Installing Pedestrian Corridor Plant which includes concrete bases, underground electrical conduits, pull pits and any cutover work needed at the Pedestrian Corridor.
Installation of new signals Cabling, Poles, Signal Heads, and PXO Controller will be by Manitoba Infrastructure, Traffic Engineering.
After the corridor has been transitioned to the new corridor by Manitoba Infrastructure, demolition of:
- Non-reused Pedestrian Corridor plant.
SECTION V - Gimli, Pedestrian Corridor at Provincial Trunk Highway (PTH) 9 and Keenora Dr
Installing Pedestrian Corridor Plant which includes concrete bases, underground electrical conduits, pull pits and any cutover work needed at the Pedestrian Corridor.
Installation of new signals Cabling, Poles, Signal Heads, and PXO Controller will be by Manitoba Infrastructure, Traffic Engineering.
After the corridor has been transitioned to the new corridor by Manitoba Infrastructure, demolition of:
- Non-reused Pedestrian Corridor plant.