SCOPE OF WORK
D3.1 The Work to be done under the Contract shall consist of four parts:
(a) Part 1 – City Funded Work
(b) Part 2 – Transit Improvements
(c) Part 3 – Water and Waste Work
(d) Part 4 – Manitoba Hydro Funded Work
Part 1 – City Funded Work
D3.2 Part 1 – City Funded Work shall consist of:
(a) Concrete Reconstruction
(i) Poole Crescent from End to Shelley Street
(b) Asphalt Reconstruction
(i) Blossom Bay from McDowell Drive to McDowell Drive
(ii) Lane from Heritage Boulevard to Pebblewood Lane
(iii) Oxbow Bend Road from Gagnon Street to St. Charles Street
(c) Pavement Rehabilitation
(i) Aldrich Avenue from Shelley Street to Wordsworth Way
(ii) Allard Avenue from Gagnon Street to Buchanan Boulevard
(iii) Haultain Crescent from Raquette Street to Raquette Street
(iv) Oxbow Bend Road from 200m West of Gagnon Street to Gagnon Street
(v) Raquette Street from Browning Boulevard to Sansome Avenue
(vi) Westlund Way from Oakdale Drive to McDowell Drive
(d) Thin Bituminous Overlay
(i) Alenbrook Bay (North Leg) from End to Oakdale Drive
(ii) McDowell Drive from Oakdale Drive to Westlund Way
Part 2 – Transit Improvements
D3.3 Part 2 – Transit Improvements shall consist of:
(a) Transit / Bike Lane Improvements
(i) Graham Avenue from Garry Street to Main Street
(b) Transit Improvements
(i) Shaftesbury Boulevard 200m North of Sterling Lyon Parkway
(ii) Sturgeon Road 100m South of Murray Park Road\
Part 3 – Water and Waste Work
D3.4 Part 3 – Water and Waste Work shall consist of:
(a) Manhole Repairs
(i) Blossom Bay
(ii) Raquette Street
(b) Sewer Repairs
(i) Poole Crescent
(ii) Westlund Way
Part 4 – Manitoba Hydro Funded Work
D3.5 Part 4 – Manitoba Hydro Funded Work shall consist of:
(a) Street Lighting Installation and Associated Work
(i) Blossom Bay from McDowell Drive to McDowell Drive
The City currently has no approved funding in the Capital Budget for Part 4 of the Work, but is anticipating receiving notification about funding from Manitoba Hydro by late May 2025. Part 4 of the Work is contingent upon Manitoba Hydro approving sufficient funding.
D3.6 The major components of the Work are as follows:
(a) Concrete Reconstruction (Poole Crescent)
(i) Complete required sewer repair
(ii) Installation of new catch basins and sewer service pipe
(iii) Removal of existing concrete pavement
(iv) Placing new separation/filtration geotextile fabric and geogrid
(v) Insulating watermains
(vi) Placing new sub-base and base course granular layers
(vii) Renewal of existing 150mm reinforced concrete driveways
(viii) Construction of 150mm reinforced concrete pavement
(ix) Renewal of existing sidewalks as required
(x) Adjustment of paving stones
(xi) Boulevard restoration
(b) Asphalt Reconstruction (Blossom Bay, Oxbow Bend Road, Lane from Heritage Boulevard to Pebblewood Lane)
(i) Complete required manhole repair (Blossom Bay)
(ii) Installation of new catch basins and sewer service pipe
(iii) Removal of existing asphalt/concrete pavement
(iv) Planing of existing asphalt pavement as required
(v) Placing new separation/filtration geotextile fabric and geogrid
(vi) Insulating water mains and water services
(vii) Placing new sub-base and base course granular layers
(viii) Renewal of existing 150mm reinforced concrete driveways
(ix) Construction of new asphalt pavement c/w reversed curb and gutter as required
(x) Construction of new asphalt overlay (Oxbow Bend Road west of Gagnon Street)
(xi) Renewal of existing sidewalks c/w detectable warning tiles as required
(xii) Adjustment of paving stones or patio blocks
(xiii) Boulevard restoration
(c) Pavement Rehabilitation (Aldrich Avenue, Allard Avenue, Haultain Crescent, Raquette Street, Westlund Way)
(i) Complete required sewer and manhole repairs
(ii) Installation of new catch basins/catchpits and sewer service/drainage connection pipe
(iii) Renewal of miscellaneous pavement slabs (150 mm reinforced concrete pavement)
(iv) Renewal of existing barrier curb
(v) Planing of existing mountable curb
(vi) Installation of modified 75 mm lip curb
(vii) Renewal of existing sidewalks c/w detectable warning tiles as required
(viii) Adjustment of catch basins and manholes
(ix) Planing of existing asphalt pavement
(x) Installation of pavement repair fabric at various locations
(xi) Construction of new asphalt overlay
(xii) Adjustment of paving stones or patio blocks
(xiii) Boulevard restoration
(d) Thin Bituminous Overlay (Alenbrook Bay (North Leg), McDowell Drive)
(i) Renewal of miscellaneous pavement slabs (150 mm reinforced concrete pavement)
(ii) Renewal of existing 75 mm lip curb
(iii) Adjustment of catch basins and manholes
(i)Construction of new asphalt overlay
(ii) Boulevard restoration
(e) Transit / Bike Lane Improvements
(i) Construct new accessible bus pads and tie-in with existing roadway and sidewalk facilities
(ii) Install new bike path delineation devices such as polyposts and pre-cast barriers
(iii) Boulevard restoration
(f) Water and Waste Work
(i) External point repairs to existing sewer mains
(ii) Replacement of manhole risers
(g) Street Lighting Installation and Associated Work
(i) Installation and removal of temporary overhead spans
(ii) Removal of existing street light poles and bases
(iii) Installation of new pre-cast concrete bases including luminaires and appurtenances
(iv) Installation of new street lighting cables in conduit (boring) and street light poles, including cable termination
(v) Installation of ground rods