Looking on a quote/proposal to provide HDPE Conduit, Tracer Wire, EF Couplers, Vaults, 48F Fibre
Optic Cable at these following locations:
FROM: UCN Campus (55 UCN Drive, Thompson, MB R8N 0A4) TO: R.D. Parker Collegiate (272 Thompson Dr N, Thompson, MB R8N 2B5)
FROM: R.D. Parker Collegiate (272 Thompson Dr N, Thompson, MB R8N 2B5) TO: École Riverside School (119 Riverside Dr, Thompson, MB R8N 0X1)
FROM: R.D. Parker Collegiate (272 Thompson Dr N, Thompson, MB R8N 2B5) TO: Deerwood School (101 Beaver Crescent, Thompson, MB R8N 1C5)
FROM: School District of Mystery Lake Board Office (408 Thompson Dr N, Thompson, MB R8N 0C5) TO: Burntwood School (103 Arctic Dr, Thompson, MB R8N 1G8)
- Site visit scheduled for May 3rd 2019
- Please submit quote by May 10 2019 with anticipated work schedule.
- Locations could possibly change from initial quote due to budget.
This includes:
Design and permits
Obtain all necessary permits, maps and demark locations needed for this project.
Construction
Obtain all public and private locates.
Supply and install preferred conduit, cables, and vaults.
HydroVac allowance for soft digging utility crossings
Supply and install PVC riser, expansion joint and weatherproof boxes and every building entry
Scan and core exterior walls as required
Backfill excavations with sand bedding and compacted aggregate
Restore all mud cuts and hard surface cuts as per City of Thompson spec
Restore all mud cuts and hard surface cuts on Mystery Lake School Division Property to pre-construction condition
Networking
Perform fibre optic splicing and terminations complete with OTDR testing
Supply and install splice enclosures in vaults and in demark rooms
Patch/splicing/termination at each site including materials
Work on existing infrastructure/switches