SECTION I – PTH 6 Bituminous Reconstruction (Twinning and Roundabout) (Project ID C07036)
Reconstruction of Provincial Trunk Highway 6, c/w passing lanes, intersection improvements at the Provincial Road 236 (roundabout) and at Provincial Trunk Highway 101 (turning lanes) including: new embankment (crushed rock and excavation material), bench cuts, culvert installations, base course, pulverizing, bituminous pavement, concrete pavements (including curb and gutter) and crushing stockpiled concrete pavement from Provincial Trunk Highway 101 to 4.0km north, in the Municipality of Rosser.
SECTION II – PR 236 Reconstruction (Project ID C07142)
Reconstruction of Provincial Road 236 including grade widening, bench cuts, granular base course, pulverizing and bituminous pavement on Provincial Road 236, from 0.3km north of provincial Trunk Highway 6 to 1.7km north of Provincial Trunk Highway 6, for a total construction distance of approximately 1.4km, in the Municipality of Rosser.
SECTION III – PR 236 Culvert Replacement (Lilyfield Road) (Project ID C07143)
Supply and install one (1) precast concrete culvert by trenching and removing two (2) existing corrugated steel culverts through Provincial Road 236, at one location, approximately 1.6km north of the Junction of Provincial Trunk Highway 6 & Provincial Road 236, in the Municipality of Rosser.