D3.
SCOPE OF WORK
D3.1 The Work to be done under the Contract shall consist of two parts:
(a)
Part 1 – City Funded Work
(b)
Part 2 – Third Party Funded Work.
Part 1 – City Funded Work
D3.2
Part 1 – City Funded Work shall consist of:
(a)
Land Drainage Sewer Installation
(i)
University Crescent from Dysart Road to Thatcher Drive
(b)
Concrete Pavement Reconstruction
(i)
University Crescent Northbound from Dysart Road to Thatcher Drive
(ii)
University Crescent Southbound from Dysart Road to Markham Road
(c)
Traffic Signal Conduit and Base Installation and Associated Works
(i)
University Crescent and Sifton Road – Installation
(ii)
University Cresent and Markham Road – Installation
(iii)
University Crescent Existing Pedestrian Corridor South of Markham Road – Removal
(d)
Water and Waste Work
(i)
Insulation of Water Mains
Part 2 – Third Party Funded Work
D3.3
Part 2 – Third Party Funded Work shall consist of:
(a)
1800 mm Land Drainage Sewer Installation
(i)
University Crescent 185 m south of Thatcher Drive
(b)
Concrete Pavement Reconstruction
(i)
University Crescent Southbound Left Turn Lane to Sifton Road
D3.4
The City currently has no executed agreement with the third party for Part 2 of the Work, but is anticipating executing an agreement by August 30, 2024. Part 2 of the Work is contingent upon the execution of the agreement.
D3.4.1
Further to C7.1, should an agreement not be executed, the City shall have the right to eliminate all of Part 2, and the Contract Price will be reduced accordingly.
The City of Winnipeg Supplemental Conditions
Tender No.252-2024 Page 2 of 26
Template Version: 2024 02 01- Const Road Works
D3.4.2
Further to C7.5, C7.5.1, and C7.6, a reduction in the Contract Price pursuant to D3.4.1 shall not be considered in calculating the aggregate reduction in the Contract Price for purposes of C7.5.
D3.4.3
If all or any portion of Part 2 is eliminated pursuant to D3.4.1, the Charged Days specified by the Contractor per D25 for Substantial Performance of the Work will be adjusted in accordance with D25.5.1.
D3.5
The major components of the Work are as follows:
(a)
Land Drainage Sewer Installation
(i)
Installation of land drainage sewers ranging in size from 300 mm to 1800 mm
(ii)
Connection of the new land drainage sewer to the land drainage sewer installed in the lands east of University Cresent by UM Properties
(iii)
Installation of catch basins and connections to the new land drainage sewers
(iv)
Relocate hydrants
(v)
Temporary surface restorations and related works
(b)
Concrete Pavement Reconstruction
(i)
Construction of temporary median detours
(ii)
Removal of existing trees
(iii)
Removal of existing asphalt and concrete pavements
(iv)
Excavation
(v)
Compaction of existing subgrade
(vi)
Placement of separation/filtration geotextile fabric and geogrid
(vii)
Placement and compaction of suitable site material
(viii)
Placement of sub-base and base course materials
(ix)
Construction of 250 mm concrete pavement (plain-dowelled) with slip-form paving equipment
(x)
Construction of 200 mm concrete pavement (reinforced)
(xi)
Construction of 180 mm barrier curb
(xii)
Construction of 180 mm modified barrier curb
(xiii)
Construction of safety curb and safety median
(xiv)
Construction of bullnoses, monolithic medians and safety medians
(xv)
Construction of sidewalk
(xvi)
Construction of 75 mm Type IA asphalt bicycle lanes
(xvii)
Adjustment of manholes and water valves
(xviii)
Placement of Type IA asphalt for tie-ins
(xix)
Boulevard grading
(xx)
Ditch grading
(xxi)
Sodding
(c)
Traffic Signal Conduit and Base Installation and Associated Works
(i)
Installation of conduit
(ii)
Installation of concrete bases
(iii)
Installation of service boxes
(iv)
Removal of concrete bases
(v)
Removal of service boxes
(vi)
Cutovers
(d)
Water and Waste Work
(i)
Insulation of water main at Sifton Road