D2. SCOPE OF WORK
D2.1 The Work to be done under the Contract shall consist of the supply and delivery of chemicals for heating and cooling HVAC systems for the period from October 1, 2023 until September 30, 2024, with the option of four (4) mutually agreed upon one (1) year extensions.
D2.1.1 The City may negotiate the extension option with the Contractor within ninety (90) Calendar Days prior to the expiry date of the Contract. The City shall incur no liability to the Contractor as a result of such negotiations.
D2.1.2 Changes resulting from such negotiations shall become effective on October 1st of the respective year. Changes to the Contract shall not be implemented by the Contractor without written approval by the Contract Administrator.
D2.1.3 Bidders are advised that, in future, the City may be participating in collaborative procurement initiatives with other levels of government. Accordingly, extensions to this Contract may not be exercised.
D2.2 The major components of the Work are as follows:
(a) supply reagents and test kits for water testing;
(b) provide a service representative and on-site technical assistance;
(c) provide water testing, evaluation and documentation on water condition; and
(d) provide calculations for bleed rate and chemical pump operations for HVAC systems.
D2.3 The Work shall be done on an "as required" basis during the term of the Contract.
D2.3.1 The type and quantity of Work to be performed under this Contract shall be as authorized from time to time by the Contract Administrator and/or Users.
D2.3.2 Subject to C7, the City shall have no obligation under the Contract to purchase any quantity of any item in excess of their actual operational requirements.
D2.4 Notwithstanding D2.1, in the event that operational changes result in substantial changes to the requirements for Work, the City reserves the right to alter the type or quantity of work performed under this Contract, or to terminate the Contract, upon thirty (30) Calendar Days written notice by the Contract Administrator. In such an event, no claim may be made for damages on the ground of loss of anticipated profit on Work.