D2. SCOPE OF WORK
D2.1 The Work to be done under the Contract shall consist of the decommissioning and removal of a wading pool and building, the supply and construction of a new “spray to drain” spray pad, and
the associated site development.
D2.2 The major components of the Work are as follows:
(a) Decommissioning and demolition of a small building;
(b) Removal of a wading pool, including the decommissioning of the sewer and water services
and the removal of the concrete pool basin;
(c) Design and construction of a straight-to-drain spray pad, including but not limited to all
associated fixtures, drains, piping, electrical works and concrete spray basin, complete with
all required permitting;
(d) Supply and installation of a concrete spray pad and associated walkways and sitting areas;
(e) Supply and Installation of water spray features;
(f) Sewer, water and electrical connections;
(g) Commissioning of the spray pad;
(h) Removal of an existing playground;
(i) Supply and installation of playground equipment;
(j) Supply and installation of rubberized protective surfacing;
(k) Supply and installation of timber edging and engineered wood fibre protective surfacing
system;
(l) Pick up and installation of site furniture;
(m) Supply and installation of chain link fencing; and,
(n) Site restoration including site grading, topsoil and sodding.
D2.3 The funds available for this Contract are $940,000.00.