D2. SCOPE OF WORK
D2.1 The Work to be done under the Contract shall consist of the decommissioning and removal of a
wading pool and building, the supply and construction of a new “spray to drain” spray pad, and
the associated site development.
D2.2 The major components of the Work are as follows:
(a) Decommissioning and demolition of a small building;
(b) Removal of a wading pool, including the decommissioning of the sewer and water services
and the removal of the concrete pool basin;
(c) Design and construction of a straight-to-drain spray pad, including but not limited to all
associated fixtures, drains, piping, electrical works and concrete spray basin, complete with
all required permitting;
(d) Supply and installation of a concrete spray pad and associated walkways and sitting areas;
(e) Supply and installation of rubber surfacing;
(f) Supply and Installation of water spray features;
(g) Sewer, water and electrical connections;
(h) Commissioning of the spray pad;
(i) Pick up and installation of site furniture;
(j) Supply and installation of Shade Structures and Bike Racks;
(k) Supply and installation of chain link fencing with decorative features; and
(l) Site restoration including site grading, topsoil and sodding.
D2.3 The funds available for this Contract are 750,000.00.