D2. SCOPE OF WORK
D2.1 The Work to be done under the proposed Contract shall consist of the small building
demolition in City owned and/or operated buildings at the direction of the Contract Administrator
for the period from date of award to February 28, 2028.
Level I Demolition
D2.2 The Work to be done under the subsequent Contract shall consist of the demolition of
small buildings.
(a) The Work shall be done on an “as required” basis during the term of the Contract.
(i) The type and quantity of Work to be performed under this Contract shall be as authorized
from time to time by the Contract Administrator and/or Users.
(ii) The City shall have no obligation under the Contract to purchase any quantity of any item
in excess of its actual operational requirements.
(b) The City will have arranged to have the gas and hydro connections disconnected and meters
removed by others.
(c) The City reserves the right to add or delete Contractors during the period stated in D2.1
in the best interest to the City.
(d) Demolitions shall be performed in accordance with (Canadian Standards Association (CSA
International) standard; CSA S350-M1980 (R2003), Code of Practice for Safety in Demolition of
Structures.
(e) Contractors shall obtain the necessary Service Permits from the City’s Public Works
Department, cut-off and abandoned all existing sewer and water pipes, including having arranged for
an Inspection of the cut-offs by the City’s Water and Waste Department
(f) The trees on site must be protected according to the City’s “Tree Protection During
Construction” specifications. These specifications can be found on the City’s website:
http://winnipeg.ca/publicworks/Forestry/documents/Principles_and_Guidelines.pdf
Level II Wet Demolition
D2.3 The work to be done under the proposed Contractor shall consist of wet demolitions of
small buildings.
(a) The Work shall be done on an “as required” basis during the term of the Contract.
(i) The type and quantity of Work to be performed under this Contract shall be as authorized
from time to time by the Contract Administrator and/or Users.
(ii) The City shall have no obligation under the Contract to purchase any quantity of any item
in excess of its actual operational requirements.
(b) The City will have arranged to have the gas and hydro connections disconnected and meters
removed by others.
(c) The City reserves the right to add or delete Contractors during the pre-qualification
period in the best interest to the City.
(d) Demolitions shall be performed in accordance with (Canadian Standards Association (CSA
International) standard; CSA S350-M1980 (R2003), Code of Practice for Safety in Demolition of
Structures.
(e) Contractor shall obtain the necessary Service Permits from the City’s Public Works
Department, cut-off and abandoned all existing sewer and water pipes, including having arranged for
an Inspection of the cut-offs by the City’s Water and Waste Department.
(f) The trees on site must be protected according to the City’s “Tree Protection During
Construction” specifications. These specifications can be found on the City’s website:
http://winnipeg.ca/publicworks/Forestry/documents/Principles_and_Guidelines.pdf.
(g) Use wet demolition procedures when the building is deemed unsafe to enter and asbestos
containing materials or other hazardous materials are suspected to be in the building to be
demolished. The major components of this work include:
(i) Demolishing the building in a controlled manner using proper asbestos removal procedures.
(ii) Control any water runoff.
(iii) Provide temporary dust screens, covers, railings, support or other protection as
required.
(iv) Follow all safety procedures outlined by the authorities having jurisdiction.