SITE INVESTIGATION
B3.1 Further to C3.1, the Contract Administrator or an authorized representative will be available at the Site at 510 Main St on Sept 19th between 10:00 and 4:00 pm to provide Bidders access to the Site. Contact the Contract Administrator with your intension to attend.
B3.2 The Bidder shall not be entitled to rely on any information or interpretation received at the Site investigation unless that information or interpretation is the Bidder’s direct observation, or is provided by the Contract Administrator in writing.
B3.3 The Bidder is responsible for determining:
(a) the location of any utility which can be determined from the records or other information available at the offices of any public authority or person, including a municipal corporation and any board or commission thereof, having jurisdiction or control over the utility;
(b) the nature of the surface and subsurface conditions at the Site;
(c) the location, nature, quality or quantity of the materials to be removed or to be employed in the performance of the Work;
(d) the nature, quality or quantity of the Plant needed to perform the Work;
(e) all matters concerning access to the Site, power supplies, location of existing services, utilities or materials necessary for the completion of the Work; and
(f) all other matters which could in any way affect their Bid or the performance of the Work.