D2. SCOPE OF WORK
D2.1 The Work to be done under the Contract shall consist of Migrating the NEWPCC existing
Distributed Control system to a PLC-based Process Control System. The scope of work includes server
and client configuration; domain controller configuration; workstation configuration; Turbo Ring v2
network configuration; installation, configuration Schneider M580 PLCs using ControlExpert; panel
fabrication; installation and configuration of an AVEVA PlantSCADA and AVEVA Historian based
Process Control System; and integration of existing PLCs and HMIs for the entire site, including
the Headworks Facility, the Interim P area and the Primary Clarifier Upgrade Projects, which are
currently under construction.
D2.3 Notwithstanding D2.1, the type and quantity of Work to be performed under this Contract
is subject to annual approval of monies therefore in a budget by Council. Proponents are advised
that monies have been approved for work up to and including December 31, 2023.
D2.3.1 In the event that Council does not approve the annual budget for any year during
this Contract, the City reserves the right to alter the type or quantity of work performed under
this Contract, or to terminate the Contract, upon one hundred and twenty (120) Calendar Days
written notice by the Contract Administrator. In such an event, no claim may be made against the
City for damages of any kind resulting from the termination, including, but not limited to, on the
ground of loss of anticipated profit on Work.
D2.4 Notwithstanding D2.1, in the event that operational changes result in substantial
changes to the requirements for Work, the City reserves the right to alter the type or quantity of
work performed under this Contract, or to terminate the Contract, upon thirty (30) Calendar Days
written notice by the Contract Administrator. In such an event, no claim may be made for damages
on the ground of loss of anticipated profit on Work.
D2.5 The funds available for this Contract are $12,000,000.00.