D2. SCOPE OF WORK
D2.1 The Work to be done under the Contract shall consist of Interior Renovation to create Winnipeg Police Service meeting space at 266 Graham Avenue as per drawings and specifications
D2.2 The major components of the Work are as follows:
(a) Demolition of the following items:
(i) Existing architectural components, including but not limited to wall partitions, doors, sidelights, flooring materials;
(ii) Miscellaneous specialties, including but not limited to shelving and brackets, wall-mounted dispensers, whiteboards, corner guards, other wall-mounted items;
(iii) Removal and disconnection of existing electrical components, including but not limited to all components with designation ‘D’ back to the source, electric baseboard heaters, thermostat.
(iv) The removal of the existing ceiling, HVAC system and lighting will be completed by the abatement contractors prior to the start of Work associated with Bid Opportunity 1174-2018.
(b) Renovation to include the installation of:
(i) New architectural components, including but not limited to wall partitions, doors, glazing, raised access flooring, other flooring materials, ramps, power door operators, millwork, painting, acoustic ceiling tile;
(ii) Miscellaneous specialties, including but not limited to television mounts, corner guards, bumpers, paper towel dispenser;
(iii) Re-installation and connection of existing electronic projector screen;
(iv) Electrical components, including but not limited to card swipe access, power and supply, wiring, telecommunications, data terminations, power door operators, lighting, exit signs;
(v) Mechanical components, including but not limited to plumbing fixtures, ventilation systems, fire protection system;
(vi) Testing and balancing, including but not limited to ventilation systems, fire protection system, network cabling.
(c) Construction activities shall be conducted in such a manner that the maximum sound levels will not exceed 80 dBA between 7:30 H and 17:00 H. Work that exceeds the maximum sound level are to be completed after office hours. Other work restrictions will be coordinated to the Contractor. Weekend and evening work hours are unrestricted.
(i) Work that is restricted during day time, including but not limited to:
(i) Hammer drilling
(ii) Jackhammering
(iii) Concrete saw cutting
(d) Contractor is required to ensure that the building is secure at all times. This includes:
(i) The exterior room 203 of the building. Contractor shall coordinate with Contract Administrator for additional security should the exterior perimeter need to be breached due to renovation activities.