D3. SCOPE OF WORK
D3.1 The Work to be done under the Contract shall consist of:
(a) Asphalt Pavement Reconstruction
(i) Manahan Avenue from Pembina Highway to Hudson Street
(b) Concrete Pavement Rehabilitation
(i) Renfrew Street from John Brebeuf Place to Grant Avenue
(ii) Montrose Street from Grant Avenue to Mathers Avenue
(iii) Scotland Avenue from Harrow Street to Wilton Street
(iv) Scotland Avenue from Harrow Street to Stafford Street
(c) Asphalt Pavement Rehabilitation
(i) Beaumont Street from Waterford Bay (South Leg) to McGillivray Boulevard
(d) Mill and Fill Rehabilitation
(i) Academy Road from Wellington Crescent South to Renfrew Street
(ii) Waverley Street from Cadboro Road to 165 Metres South
(e) Sewer Repairs and Associated Works
(i) Manahan Avenue from Pembina Highway to Hudson Street
(f) Manitoba Hydro Street Lighting
(i) Manahan Avenue from Pembina Highway to Hudson Street
D3.2 The major components of the Work are as follows:
(a) Asphalt Pavement Reconstruction
(i) Pavement Removal;
(ii) Excavation;
(iii) Placement of RCA sub-base material as required;
(iv) Placement of geotextile fabric;
(v) Placement of geogrid;
(vi) Insulation of water services;
(vii) Subgrade compaction;
(viii) Placement of sub-base and base course material;
(ix) Installation of catch basin and connecting pipes;
(x) Installation of concrete isolations;
(xi) Installation of subdrains;
(xii) Construction of barrier curb for asphalt pavements;
(xiii) Construction of modified barrier curb for asphalt pavements;
(xiv) Construction of lip curb for asphalt pavements;
(xv) Construction of ramp curb for asphalt pavements;
(xvi) Placement and compaction of 50mm sub-base material as backfill behind barrier curb for
asphalt pavement within excavated area;
(xvii) Placement and compaction of suitable site material as backfill behind barrier curb for
asphalt pavement within excavated area;
(xviii) Installation of 150mm reinforced approach;
(xix) Sidewalk renewal;
(xx) Installation of detectable warning surface tiles;
(xxi) Adjustment of precast sidewalk blocks;
(xxii) Placement of asphalt pavement (Type III, 75mm thickness);
(xxiii) Placement of asphalt pavement (Type 1A, 50mm thickness);
(xxiv) Adjustment of existing catch basins, manholes and appurtenances;
(xxv) External point repair of catch basin leads and land drainage sewers;
(xxvi) Replacement of water service;
(xxvii) Boulevard restoration and sod; and
(xxviii) Street lighting improvement and associated works.
(b) Concrete Pavement Rehabilitation
(i) Planing of existing asphalt as required;
(ii) Renewal of existing sidewalk as required;
(iii) Construction of concrete sidewalk;
(iv) Installation of detectable warning surface tiles;
(v) Installation of catch basin/catch pits and connection pipe;
(vi) Abandon existing drainage inlets;
(vii) Installation of catch pits and drainage connection pipes;
(viii) Installation of catch basins and catch basin leads;
(ix) Full-depth concrete repairs of existing joints and slabs;
(x) Planing / Removal / Renewal of existing barrier curb as required;
(xi) Renewal of barrier curb;
(xii) Renewal of modified barrier curb;
(xiii) Adjustment of precast sidewalk blocks;
(xiv) Adjustment of existing catch basins, manholes and appurtenances;
(xv) Placement of pavement repair fabric as required;
(xvi) Placement of asphalt overlay:
(i) Renfrew Street – John Brebeuf/Grant (average thickness 75mm)
(ii) Montrose Street – Grant/Mathers (average thickness 75mm)
(iii) Scotland Avenue – Harrow/Wilton (average thickness 75mm)
(iv) Scotland Avenue – Harrow/Stafford (average thickness 75mm)
(xvii) Boulevard restoration and sod.
(c) Asphalt Pavement Rehabilitation
(i) Planing of existing asphalt;
(ii) Full depth patching of asphalt pavement;
(iii) Preparation of existing granular shoulders;
(iv) Installation / renewal of barrier curb and gutter (450mm wide);
(v) Installation of detectable warning tiles;
(vi) Placement of pavement repair fabric;
(vii) Placement of asphalt overlay (100mm average);
(viii) Partial and full asphalt paving of existing private approaches;
(d) Mill and Fill Rehabilitation
(i) Planing of existing asphalt overlay;
(ii) Full depth concrete repairs of existing slabs and joints;
(iii) Installation of catch basins and connection pipe;
(iv) Installation of catch pits and drainage connection pipes;
(v) Renewal of existing barrier curb;
(vi) Partial renewal of existing barrier curb with splash strip;
(vii) Adjustment of existing catch basins, water valves, and manholes;
(viii) Partial renewal of existing sidewalk;
(ix) Installation of detectable warning tiles; and
(x) Placement of asphalt overlay (average thickness – 75mm)
(e) Sewer Repairs and Associated Works
(i) External point repairs of existing sewers; and
(ii) Sewer and sewer service video inspection.
(f) Manitoba Hydro Street Lighting
(i) Removal of existing street light poles;
(ii) Installation of conduit cable; and
(iii) Installation of new bases and poles.
D3.3 The funds available for this Contract are $4,500,000.