D3. SCOPE OF WORK
D3.1 The Work to be done under the Contract shall consist of:
(a) Pavement Rehabilitation
(i) Agate Bay from Drake Boulevard to Drake Boulevard
(ii) Cherwell Road from Beaverhill Boulevard to Bluewater Crescent (North Leg)
(iii) Fernwood Ave from St. Anne’s Road to end
(iv) Gatineau Bay from Crestwood Crescent to Crestwood Crescent
(v) Morrow Avenue from St. Anne’s Road to end
(vi) Radburn Place from Beaverhill Boulevard to end
(vii) Regal Avenue from St. Anne’s Road to Rue Des Meurons
(viii) Royal Salinger Road from Pebble Beach Road to Niakwa Road
(ix) Seabrook Cove from end to Beaverhill Boulevard
(x) Stillwater Road from Willowlake Crescent to Brookhaven Bay
(xi) West Fernwood Avenue from Dunkirk Drive to Bronstone Boulevard
(xii) Woodford Bay from Meadowood Drive to Meadowood Drive
D3.2 The major components of the Work are as follows:
(a) Pavement Rehabilitation
(i) Planing of existing asphalt, as required;
(ii) Renewal of existing sidewalk, as required;
(iii) Construction of concrete sidewalk;
(iv) Installation of detectable warning tiles;
(v) Installation of catch basins / catch pits and connection pipes;
(vi) Abandon existing drainage inlets;
(vii) Full depth concrete joint and slab repairs;
(viii) Removal / renewal of existing curb;
(ix) Construction of modified lip curb;
(x) Installation / renewal of modified barrier curb and curb ramp;
(xi) Adjustment of precast sidewalk blocks;
(xii) Adjustment of existing catch basin, catch pit, and manhole frames and covers;
(xiii) Adjustment of water main valves, curb stops and other appurtenances;
(xiv) Placement of pavement repair fabric, as required;
(xv) Placement of asphalt overlay;
(i) Thickness 65mm (average)
◻ Radburn Place
◻ Seabrook Cove
(ii) Thickness 80mm (average)
◻ Agate Bay
◻ Cherwell Road
◻ Fernwood Avenue
◻ Gatineau Bay
◻ Morrow Avenue
◻ Regal Avenue
◻ Royal Salinger Road
◻ Stillwater Road
◻ West Fernwood Avenue
◻ Woodford Bay
(xvi) Boulevard restoration and sod.