Full Title: 2022 Industrial Street Renewal Program - Saskatchewan Avenue Pavement Reconstruction
D3. SCOPE OF WORK
D3.1 The Work to be done under the Contract shall consist of two parts:
(a) Part 1 – City Funded Work
(b) Part 2 – Manitoba Hydro Funded Work
Part 1 – City Funded Work
D3.2 Part 1 – City Funded Work shall consist of:
(a) Concrete Pavement Reconstruction
(i) Saskatchewan Avenue from Sherwin Road to St. James Street
(b) Railway Crossing and Associated Works
(i) Saskatchewan Avenue east of Sherwin Road
(c) Water and Waste Work
(i) Saskatchewan Avenue from Sherwin Road to St. James Street
Part 2 – Manitoba Hydro Funded Work
D3.3 Part 2 – Manitoba Hydro Funded Work shall consist of:
(a) Street Lighting Installation and Associated Works
(i) Saskatchewan Avenue from Sherwin Road to St. James Street
D3.4 The City currently has no approved funding in the Capital Budget for Part 2 of the
Work, but is anticipating receiving notification about funding from Manitoba Hydro by late May.
Part 2 of the Work is contingent upon Manitoba Hydro approving sufficient funding.
D3.4.1 Further to C7.1, if notice of sufficient funding is not received, the City shall
have the right to eliminate all or any portion of Part 2, and the Contract Price will be reduced
accordingly.
D3.4.2 Further to C7.5, C7.5.1, and C7.6, a reduction in the Contract Price pursuant to
D3.4.1 shall not be considered in calculating the aggregate reduction in the Contract Price for
purposes of C7.5.
D3.4.3 If all or any portion of Part 2 is eliminated pursuant to D3.4.1, the time
periods stipulated in D23 for Substantial Performance of the Work and in D24 for Total Performance
of the Work will be reduced proportionally by the Contract Administrator acting reasonably.
D3.5 The major components of the Work are as follows:
(a) Concrete Pavement Reconstruction
(i) Removal of existing catch basins and abandonment of existing leads
(ii) Installation of catch basins and sewer service pipe
(iii) Removal of existing asphalt and concrete pavement
(iv) Removal of existing rail line
(v) Excavation
(vi) Installation of subdrains
(vii) Compaction of existing subgrade
(viii) Placement of separation/filtration geotextile fabric and geogrid
(ix) Placement of sub-base and base course materials
(x) Construction of 250 mm plain-dowelled concrete pavement (main line)
(xi) Construction of 200 mm reinforced concrete pavement (approaches)
(xii) Construction of 180 mm modified barrier curb
(xiii) Construction of 120 mm mountable curb
(xiv) Renewal and construction of sidewalk
(xv) Adjustment of existing manholes and water valves
(xvi) Placement of 75 mm Type IA asphalt for active transportation pathway
(xvii) Placement of Type IA asphalt for tie-ins
(xviii) Boulevard grading
(xix) Sodding
(b) Railway Crossing and Associated Works
(i) Removal and disposal of existing asphalt pavement and track
(ii) Installation of new 115 lb jointed track, including welds
(iii) Installation of rail seal
(iv) Placement of Type IA asphalt pavement
(c) Water and Waste Work
(i) Insulation of water services under roadway
(d) Street Lighting Installation and Associated Works
(i) Installation and removal of temporary overhead spans
(ii) Removal of existing street light poles and bases
(iii) Installation of new pre-cast concrete bases including luminaires and appurtenances
(iv) Installation of new street lighting cables in conduit (trenching and boring) and street
light poles, including cable termination
(v) Installation of ground rods