Full Title: 2021-2022 Pioneer Avenue, William Stephenson Way, Colony Street and St. Mary Avenue Renewals Project.
D2. SCOPE OF WORK
D2.1 The Work to be done under the Contract shall consist of two parts:
(a) Part 1 – City Funded Work
(b) Part 2 – Provincially Funded Work.
Part 1 – City Funded Work
D2.2 Part 1 – City Funded Work shall consist of:
(a) Concrete Pavement Reconstruction and Protected Bike Lanes
(i) St. Mary Avenue from Memorial Boulevard to Portage Avenue
(b) Asphalt Pavement Reconstruction
(i) Pioneer Avenue from Westbrook Street to Main Street
(ii) William Stephenson Way from Main Street to Westbrook Street
(c) Thick Asphalt Overlay
(i) Colony Street from Portage Avenue to St. Mary Avenue
(d) Sidewalk Renewal and Streetscaping
(i) Northbound Main Street from Graham Avenue to Pioneer Avenue
(e) Minor Sidewalk Maintenance
(i) Eastbound William Stephenson Way from Westbrook Street to Israel Asper Way
Part 2 – Provincially Funded Work
D2.3 Part 2 – Provincially Funded Work shall consist of:
(a) New Street Light Installation
(i) St. Mary Avenue from Memorial Boulevard to Portage Avenue
(ii) Pioneer Avenue from Westbrook Street to Main Street
(iii) William Stephenson Way from Main Street to Westbrook Street
D2.4 The City currently has no approved funding in the Capital Budget for Part 2 of the
Work, but is anticipating receiving notification about funding from the Province of Manitoba by
late May. Part 2 of the Work is contingent upon the Province approving sufficient funding.
D2.4.1 Further to C7.1, if notice of sufficient funding is not received, the City shall
have the right to eliminate all or any portion of Part 2, and the Contract Price will be reduced
accordingly.
D2.4.2 Further to C7.5, C7.5.1, and C7.6, a reduction in the Contract Price pursuant to
D2.4.1 shall not be considered in calculating the aggregate reduction in the Contract Price for
purposes of C7.5.
D2.4.3 If all or any portion of Part 2 is eliminated pursuant to D2.4.1, the time
periods stipulated in D19.1.6 for Substantial Performance of the Work and in D21 for Total
Performance of the Work will be reduced proportionally by the Contract Administrator acting
reasonably.
D2.5 The major components of the Work are as follows:
(a) Concrete Pavement Reconstruction and Protected Bike Lanes
(i) Removal of existing pavement
(ii) Construction of temporary asphalt
(iii) Excavation
(iv) Installation of sub-drains
(v) Installation of streetlights and associated infrastructure
(vi) Installation of traffic signal underground conduit, bases and pits
(vii) Installation of catch basins and sewer service pipe
(viii) Installation of watermain and water service insulation
(ix) Placement of separation geotextile fabric
(x) Placement of sub-base and case course materials
(xi) Adjustment of utility manholes frames
(xii) Construction of 250mm plain dowel jointed pavement
(xiii) Construction of 200mm reinforced concrete pavements
(xiv) Construction of 180mm integral barrier curb
(xv) Construction of concrete median
(xvi) Construction of sidewalks with block-outs
(xvii) Installation of detectable warning tiles
(xviii) Installation of paving stones
(xix) Installation of green durable pavement markings for bike lanes
(xx) Installation of raised monolithic concrete curbing and median for bike lane separation
(b) Asphalt Pavement Reconstruction
(i) Removal of existing pavement
(ii) Excavation
(iii) Installation of sub-drains
(iv) Installation of streetlights and associated infrastructure
(v) Installation of traffic signal underground conduit, bases and pits
(vi) Installation of catch basins and sewer service pipe
(vii) Installation of watermain and water service insulation
(viii) Placement of separation geotextile fabric
(ix) Placement of sub-base and case course materials
(x) Adjustment and reconstruction of utility manholes frames and roofs
(xi) Construction of type III asphaltic base course
(xii) Construction of type 1A asphalt
(xiii) Construction of 180mm barrier curb and gutter
(xiv) Construction of sidewalks with block-outs
(xv) Installation of detectable warning tiles
(xvi) Installation of paving stones
(xvii) Installation of thickened slabs for transit shelters and provision of electrical
connections for heated shelters
(xviii) Installation of concrete piles and electrical connections for transit signage
(xix) Installation of silva cells and soil planting medium
(xx) Installation of tree grates
(xxi) Installation of coloured concrete for sidewalk
(xxii) Installation of durable lane markings for gore area
(c) Thick Asphalt Overlay
(i) Full depth concrete repairs of existing slabs and joints
(ii) Placement of pavement repair fabric
(iii) Adjustment of catch basins, water valves and manholes
(iv) Renewal of existing sidewalk
(v) Installation of detectable warning tiles
(vi) Placement of asphalt overlay (average thickness – 80mm)
(d) Sidewalk Renewal and Streetscaping
(i) Sidewalk removal
(ii) New concrete sidewalk with block-outs
(iii) Installation of paving stones
(iv) Regrading of existing paving stones
(v) Hydrant relocation
(vi) New street light installation
(vii) Sod restoration
(viii) Installation of silva cells and soil planting medium
(ix) Installation of coloured concrete for sidewalk
(x) Installation of tree grates
(xi) Installation and maintenance of trees
(xii) Installation of benches
(e) Minor Sidewalk Maintenance
(i) Sidewalk slab renewals
(ii) Curb ramp renewals and curb ramp widening