D2. SCOPE OF WORK
D2.1 The Work to be done under the Contract shall consist of: (a) 2022
(i) Stafford Street – Pavement Reconstrution
◻ Ebby Avenue to Scotland Avenue, southbound lanes
◻ Scotland Avenue to Corydon Avenue, all lanes
(ii) Harrow Street – Asphalt Path Construction
◻ Construct asphalt pathway and cycling f acilities on Harrow Street f rom Taylor Avenue south to
connect to the existing asphalt path at the Pembina Hwy Underpass at Jubilee Avenue
(b) 2023
(i) Staf ford Street – Pavement Reconstruction
◻ Pembina Highway to Ebby Avenue, all lanes
◻ Ebby Avenue to Scotland Avenue, northbound lanes
(ii) Taylor Avenue – Pavement Reconstruction
◻ Harrow Street to Pembina Highway
D2.2 The major components of the Work are as follows:
(a) Pavement Reconstruction
(i) Watermain Renewal
(ii) Removal of existing pavement
(iii) Removal of existing streetcar tracks and bedding
(iv) Construction of temporary asphalt pavement
(v) Excavation
(vi) Installation of subdrains
(vii) Installation of streetlights and associated inf rastructure
(viii) Installation of Traf f ic Signal underground conduit, bases and pits
(ix) Demolition of existing OHSS base
(x) Installation of new OHSS base and cantilever and new crash cushion
(xi) Compaction of existing sub-grade
(xii) Installation of catch basins and sewer service pipe
(xiii) Installation of watermain and water service insulation
(xiv) Relocation/Adjustment of f ire hydrants
(xv) Repairs to existing sewers and manholes
(xvi) Completion of mainline sewer repairs
(xvii) Placement of separation f abric
(xviii) Placement of geogrid
(xix) Placement of sub-base and base course materials
(xx) Adjustment of existing Utility Manhole Frames
(xxi) Adjustment of existing pavement appurtenances
(xxii) Construction of 250mm reinf orced, dowel jointed concrete pavements
(xxiii) Construction of 200mm reinf orced concrete pavements
(xxiv) Construction of 180mm integral barrier curb
(xxv) Construction of concrete median
(xxvi) Construction of splash strip
(xxvii) Construction of sidewalks with block-outs
(xxviii) Construction of Asphalt Pathway
(xxix) Installation of paving stones
(xxx) Renewal of existing sidewalk
(xxxi) Regrading of private walkways (paving stones, concrete, exposed aggregate concrete)
(xxxii) Installation of thickened, reinf orced sidewalk for Transit stop f lags
(xxxiii) Installation and modification of existing timber f encing
(xxxiv) Completion of boulevard grading
(xxxv) Installation of topsoil and sod