.1) The Metal Storage Shelving and Racking work included in this Section shall comprise the provisions of all necessary engineering, fabrication, surveying, labour, materials, installation, testing, inspection, QA/QC, tools, equipment, off-loading, loading and disposal of all materials, insurance, taxes, licenses, permits, safety equipment, general requirements, competent supervision, office management, and all else necessary or required for the proper execution of the Work in accordance with the full intent of the drawings, specifications, and construction schedule, including the scope of work, and shall include, but not necessarily be limited to, the following:
- Specification section - 10 56 13 Metal Storage Shelving and Racking
- Shelving System
- Pallet Racking System
- Associated accessories
and other Specification Sections pertaining to your work and expertise in performing this work regardless of where shown on drawings or where specified in documents (General section requirements and coordinate with all) Coordinate the requirements of all other trades when applicable to execute the completion and schedule of this work.
.2) Comply with security requirement for working in CFB Esquimalt
.3) Protect all installed work with poly and coordinate removal at turn-over with by construciton manager, removing protection is the responsibility of this subcontract.