REQUEST FOR PREQUALIFICATIONS
PACKAGE #66 LANDSCAPING & PUBLIC REALM (ROADS) for PORT LANDS FLOOD PROTECTION PROJECT in the CITY OF TORONTO
Date of Issue: Thursday, November 15, 2018
Closing date and time: Thursday, November 29, 2018 at 2:00 pm
EllisDon Corporation is the Construction Manager for the Toronto Waterfront Revitalization Corporation (TWRC) Cherry Street Storm Water and Lake Filling Project (CSLF) and Port Lands Flood Protection Project (PLFP). EllisDon invites eligible companies, firms or joint ventures to submit qualifications for Landscaping and Public Realm (roads) for construction of the PLFP project, located in the city of Toronto. Works to include:
- Excavation of planting area;
- Supply and installation of:
- Soil cell system and associated components; Top soil; Sod; Terraseeding; Planting beds; Trees (including Treegator Original bag, stakes and guards); Irrigation system as required; Shrubs and plants; Tree grills; Bench toppers; Bollards;
- Installation of bicycle rings and site furnishings;
- Supply materials and execution of pavers; custom made formwork, concrete planter curbs, walls, benches, as required.
Where the anticipated contract value is greater than $250,000 the proponent will be required to enroll in EllisDon’s corporate Subcontractor Default Insurance Program, or have the ability to bond with an established surety company.
Interested parties with a minimum of five (5) years of experience shall submit their interest to the following address in order to receive the RFQ documentation.
Email to: tenderplfpei@ellisdon.com, to the attention of Esther Perez.
Subject: RFQ Package #66 LANDSCAPING & PUBLIC REALM (ROADS) – “name of your company”
EllisDon reserves the right to disqualify interested parties based on review of the documents requested in the RFQ documentation.
It is expected that a short list of up to four (4) companies will be pre-qualified.