The Wilfrid Laurier University Faculty of Music project includes demolition and renovations to the current Aird Building 1st floor, 2nd floor, and Bar Building encompassing approximately 18,000 SF. This project also includes 6,000 SF of new construction and major exterior site improvements. This is a sequentially tendered project and construction has commenced. The Bar Building renovation is scheduled for completion December 2022. The main project addition/renovation is planned for December 2023 completion.
The following packages are being tendered at this time:
TENDER PACKAGE NO. 5A-FLOORING (TILING, RESILIENT & CARPET)
TENDER PACKAGE NO. 5B-WOOD FLOORING
TENDER PACKAGE NO. 5C-MECHANICAL ROOM FLOOR WATERPROOFING
TENDER PACKAGE NO. 5D-PAINTING & CONCRETE FLOOR SEALING
TENDER PACKAGE NO. 5E-ACOUSTIC PANELS
TENDER PACKAGE NO. 5F-TACKBOARDS
TENDER PACKAGE NO. 5G-STAINLESS STEEL TOILET COMPARTMENTS
TENDER PACKAGE NO. 5H-WASHROOM ACCESSORIES
TENDER PACKAGE NO. 5I-SKATE DETERRENT PINS
TENDER PACKAGE NO. 5J-FIRE SAFETY PLAN BOX
TENDER PACKAGE NO. 5K-WINDOW SHADES
TENDER PACKAGE NO. 5L-FLOOR GRILLES
TENDER PACKAGE NO. 5M-INCLINE WHEELCHAIR LIFTS
TENDER PACKAGE NO. 5N-ASPHALT PAVING & LINE PAINTING
TENDER PACKAGE NO. 5O-CONCRETE CURBS, SIDEWALKS AND PAVING
TENDER PACKAGE NO. 5P-EXTERIOR EXCAVATION & BACKFILL
TENDER PACKAGE NO. 5Q-EXTERIOR CAST-IN-PLACE CONRETE & REINFORCING STEEL
TENDER PACKAGE NO. 5R-PRECAST CONCRETE BENCHES
TENDER PACKAGE NO. 5S-TREES, SHRUBS AND GROUNDCOVERS, INCLUDING PLANTING BED TOPSOIL
TENDER PACKAGE NO. 5T-SODDING, INCLUDING TOPSOILING