The Province House building is an existing three story structural load bearing stone structure that is more than 150 years old and is located downtown Charlottetown, Prince Edward Island. The Province House is a classified heritage building. Original Construction took place between 1843-1846 before opening January of 1847, the Province House Building had an significant role in helping Prince Edward Island host the Charlottetown Conference which in turn resulted in Canadian Confederation. Since that time, the Province House Building has undergone a restoration of the structure from 1979-1983; however, the majority of the base building envelope, vertical transportation systems and mechanical/electrical infrastructures are significantly outdated and require either significant upgrades or full replacement. Given the age and condition of the building, the Province House building requires extensive upgrades to ensure its recapitalization as a Major Crown asset. The building will receive an extensive masonry restoration, repaired foundations, slab on grade, and new slate & copper roof.
The following is the anticipated scope of services required:
1. Supply and install temporary standpipe sprinkler system as per engineered drawings FP-1 of 1, Issued for Review.
2. To complete supplementary engineered drawings showing mains, branch lines, sprinkler heads, etc.… providing adequate fire protection protection for the entire building is to be completed by the subcontractor.
3. Subcontractor to provide all materials, labour & equipment to complete the temporary standpipe
4. Subcontractor is required to provide firestopping at any floor penetrations as required.
5. Subcontractors are to be aware that no hot works are allowed inside the building.
6. Please use attached link to view project drawings: https://pcl.egnyte.com/dl/q7l0RSXtTX
7. Separate price break out: Provide pricing for decommissioning and removal of existing sprinkler system in the building. Site visit will be required to review this system and get the scope of work understood. Removals to include all materials, equipment and labour to complete the removals. Pipe removals and
disposal from site it to be included in removals pricing.