D2. SCOPE OF WORK
D2.1 The Work to be done under the Contract shall consist of the supply and installation of
door access hardware at the following City of Winnipeg locations;
(a) 185 King St, Winnipeg, Manitoba,
(b) 510 Main St, Winnipeg, Manitoba,
(c) 457 Main St, Winnipeg, Manitoba,
(d) 999 Sargent Ave, Winnipeg, Manitoba
(e) 960 Thomas, Winnipeg, Manitoba,
(f) 421 Osborne, Winnipeg, Manitoba,
(g) 65 Garry St. Winnipeg, Manitoba,
(h) 90 Sinclair, Winnipeg, Manitoba,
(i) 395 Main St, Winnipeg, Manitoba,
(j) 600 Brandon, Winnipeg, Manitoba,
(k) 2546 McPhillips, Winnipeg, Manitoba,
(l) 251 Donald, Winnipeg, Manitoba,
(m) 909 Concordia, Winnipeg, Manitoba,
(n) 770 Ross, Winnipeg, Manitoba,
(o) 752 McGee, Winnipeg, Manitoba,
(p) 685 Dalhousie, Winnipeg, Manitoba,
(q) 4910 Roblin, Winnipeg, Manitoba,
(r) 444 Adsum, Winnipeg, Manitoba,
(s) 40 Mayfair, Winnipeg, Manitoba,
(t) 30 Fort, Winnipeg, Manitoba,
(u) 266 Graham, Winnipeg, Manitoba,
(v) 243 Main, Winnipeg, Manitoba,
(w) 1539 Waverly, Winnipeg, Manitoba,
(x) 1410 Rothesay, Winnipeg, Manitoba,
(y) 1277 Pacific, Winnipeg, Manitoba,
(z) 1155 Pacific, Winnipeg, Manitoba, (aa) 1199 Pacific, Winnipeg, Manitoba, (bb) 1120 Wave,
Winnipeg, Manitoba,
(cc) 1090 Thomas, Winnipeg, Manitoba, and
(dd) 210 Portage, Winnipeg, Manitoba.
D2.2 The major components of the Work are as follows:
(a) Supply and installation of Mercury LP1502 access controls, and
(b) Supply and installation of Mercury MR52-S3 controls.