A mandatory site visit meeting has been scheduled as follows:
Location: Main Floor Cafeteria, 405 Broadway, Winnipeg, MB
Date: January 25, 2022
Proponents are to meet at 405 Broadway, Winnipeg, MB main floor cafeteria prior to 1:30 pm to sign the site attendance sheet.
Dependant on attendee counts, a second site visit may be added at 3:00 pm to accommodate everyone. Attendees will be notified upon registration if they are part of the secondary site visit group.
Mandatory attendance at the site visit is required of all general contractors and the prequalified moving service sub contractor. All other sub contractors are optional attendance, however, it is recommended the mechanical sub contractors attend.
Due to COVID restrictions, only one (1) representative per company will be permitted to attend the site visit to limit group sizes. Attendees must wear protective face masks at all times while on site. Attendees must provide their own protective face masks. Failure to do so will prevent access to the facility. Face masks do not need to be medical grade but will need to cover the mouth and nose.
Proponents are to pre-register by email to the project coordinator at alex.needham@gov.mb.ca. A link to the meeting time for your walkthrough will be sent as confirmation of attendance. It is the Proponents responsibility to ensure registration and confirmation has been received prior to the meeting. Deadline for registration is the end of the business day January 24th, 2022.